This shop is an online catalogue of our inventory and products.

RV16AF-42-15R1-B100K-3LA Potentiometer Rotary 16mm 100KΩ Linear PCB Long Lead Round 6mmx15mm

$5.00

Alpha (Taiwan), Potentiometer, Rotary, 100K Ohms Linear Taper, PCB Mount Long 20.7mm Leads, 1 Gang, 1 Turn, Horizontal, 125 mW (1/8 W), 150VAC, 20% Tolerance, Metal Element, Shaft: Smooth, D: 6mm, L: 15mm

SKU: 19507548 Category: